CBRE IM begins construction of a multi-tenant logistics facility exceeding 5.6 m2 in Ogori City, Fukuoka Prefecture.

August 07, 2025 / Logistics facilities

PR article

In July, CBRE Investment Management Japan (CBRE IM) began construction in Ogori City, Fukuoka Prefecture, on a four-story, multi-tenant logistics facility tentatively named "(tentative name) CBRE IM Ogori I" through a special purpose company. The facility will have a total floor area of ​​55,765 m2 (16,869 tsubo).

<Exterior perspective of (tentative name) CBRE IM Ogori I & II>
20250807cbre1 - CBRE IM / Construction begins on a multi-tenant logistics facility exceeding 5.6 m2 in Ogori City, Fukuoka Prefecture.

Following the commencement of construction on (tentative name) CBRE IM Ogori I, construction on (tentative name) CBRE IM Ogori II is scheduled to begin in October 2025. These facilities are planned on a site totaling approximately 52,500 m2, facing Prefectural Road 53 (Kurume-Chikushino Line) and divided into east and west sections by the road.

The facility is scheduled for completion in November 2026. It is located approximately 1 km from the Chikugo-Ogori Interchange on the Oita Expressway and approximately 8 km from the Tosu Junction, a junction of major arterial roads connecting the east, west, north, and south of Kyushu, including the Kyushu Expressway, Nagasaki Expressway, Oita Expressway, and National Route 3. This location is ideal as a strategic logistics hub covering central Fukuoka and the entire Kyushu region.

The building specifications include a 5.5m effective ceiling height below the beams, a floor load capacity of 1.5t/m2, and a two-story logistics facility with truck berths on the first and second floors using ramps. Its highly versatile specifications allow it to meet diverse customer needs.

<Location Map>
20250807cbre2 - CBRE IM / Construction begins on a multi-tenant logistics facility exceeding 5.6 m2 in Ogori City, Fukuoka Prefecture.

■ "(Tentative Name) CBRE IM Ogori I" Property Overview
Location: 1015-1 Kitatateishi, Fukiage, Ogori City, Fukuoka Prefecture (and other addresses)
Access: Approximately 1 km from the Chikugo-Ogori Interchange on the Oita Expressway.
     Approximately 18 minutes on foot from Amagi Railway's "Imakuma Station"
Approximately 7 minutes by car from Nishitetsu Tenjin Omuta Line "Oho Station"
It's about 34 km to Fukuoka Airport (about 38 minutes by car).
It's about 37 km to Hakata Port (about 40 minutes by car).
Site area: 27,281.73 m2 (7756.43 tsubo)
Total floor area: 55,765.36 m2 (16,869.02 tsubo)
Structure: Steel frame
Number of floors: 4 stories above ground
Start of construction: September 2025
Completion: June 2026 (scheduled)

LNEWS is a B2B news site specializing in logistics.
We send out emails every weekday morning.

Sign up for our free email newsletter here

LNEWS is a B2B news site specializing in logistics.
We send out emails every weekday morning.

Sign up for our free email newsletter here

Latest news on multi-tenant architecture

View All Articles

Latest news about Fukuoka Prefecture

View All Articles

Latest news on CBRE IM

View All Articles

Latest news on logistics facilities

Latest news